Work continues apace on the bridge. Comments around town are positive, seeing that true repair and replacement is really going on. Well done, guys! Carry on.
While supposedly the bridge will be functional when finished, there is obviously not much point to it, with the water pipe on one side and the sewer pipe on the other (a local man told me the other day that even if those obstacles
No comments:
Post a Comment